Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2402 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $13,327 | $84,652 | n/a |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | n/a |
UW2402 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,310 | $375 | n/a |
UW2402 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,076 | $311,400 | n/a |
UW2402 # 04 Y:2024 | 04 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,000 | $117,000 | n/a |
UW2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,045 | $582 | n/a |
UW2402 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $282 | $1,742 | n/a |
UW2402 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,442 | $5,083 | n/a |
BS0138 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $270 | Not Implemented |
BS0138 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,016 | $73,500 | Not Implemented |
BS0138 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $11,555 | $51,920 | Not Implemented |
OR0691 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $1,955 | Implemented |
OR0691 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $772 | $4,048 | Not Implemented |
OR0691 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,762 | $1,200 | Implemented |
OR0691 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $220,769 | $39,442 | Not Implemented |
OR0611 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $2,436 | $2,159 | Not Implemented |
OR0611 # 07 Y:2013 | 07 | 2013 | AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK | $1,200 | $5,464 | Not Implemented |
OR0611 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,410 | $3,724 | Not Implemented |
OR0611 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $922 | $2,134 | Not Implemented |
OR0611 # 02 Y:2013 | 02 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $8,684 | $5,600 | Not Implemented |
OR0611 # 01 Y:2013 | 01 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,437 | $0 | Not Implemented |
OR0611 # 04 Y:2013 | 04 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $5,340 | $11,938 | Not Implemented |
OR0611 # 03 Y:2013 | 03 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $7,909 | $37,830 | Not Implemented |
UW0037 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $709 | $0 | Implemented |
UW0037 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $921 | $1,842 | Not Implemented |