IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0310 # 03 Y:2009 03 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,546 $6,848 Not Implemented
LL0310 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $607 $30 Not Implemented
LL0310 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $500 $441 Implemented
LL0310 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $360 $270 Not Implemented
DL0035 # 01 Y:2009 01 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $70,852 $10,000 Not Implemented
DL0035 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $76,620 $120,000 Not Implemented
DL0035 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,425 $12,000 Implemented
DL0035 # 04 Y:2009 04 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $28,800 $44,500 Not Implemented
DL0035 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,041 $0 Not Implemented
DL0035 # 06 Y:2009 06 2009 USE MINIMUM STEAM OPERATING PRESSURE $2,530 $0 Not Implemented
UM0350 # 01 Y:2009 01 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,346 $12,800 Not Implemented
UM0350 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $13,487 $13,000 Implemented
UM0350 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $7,300 $1,500 Not Implemented
UM0350 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,744 $30,000 Implemented
UM0350 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,990 $100 Not Implemented
UM0350 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,186 $10,960 Not Implemented
UM0350 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $846 $474 Not Implemented
UM0350 # 08 Y:2009 08 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $649 $1,200 Implemented
UW0026 # 01 Y:2009 01 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $324,630 $300,000 Not Implemented
UW0026 # 02 Y:2009 02 2009 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $93,152 $13,100 Not Implemented
UW0026 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,086 $19,000 Implemented
UW0026 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,037 $0 Implemented
UW0026 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $200 Implemented
UW0026 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,522 $19,854 Implemented
MS0338 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,260 $40,176 Implemented