IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,902

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0551 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $585 $20,063 Implemented
SU0551 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,149 $15,000 Implemented
SU0551 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,582 $0 Implemented
SU0551 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $1,050 Implemented
SU0551 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $9,473 $27,789 Implemented
SU0551 # 10 Y:2024 10 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $181 $0 Not Implemented
SU0551 # 11 Y:2024 11 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $62,603 $652,137 Implemented
KS2428 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $50,912 $453,376 n/a
KS2428 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,393 $5,480 n/a
KS2428 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,046 $90 n/a
KS2428 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,696 $48,503 n/a
KS2428 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,586 $516 n/a
KS2428 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,084 $38,536 n/a
KS2428 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $1,861 $7,620 n/a
LS2406 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,003 $50 Implemented
LS2406 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,468 $750 Not Implemented
LS2406 # 03 Y:2024 03 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $9,410 $28,500 Implemented
LS2406 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,460 $11,500 Not Implemented
OR0788 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $126,866 $2,500,000 Implemented
OR0788 # 02 Y:2024 02 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,469 $250,000 Not Implemented
OR0788 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,448 $150,000 Not Implemented
OR0788 # 04 Y:2024 04 2024 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,183 $30,000 Not Implemented
OR0788 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,766 $200,000 Not Implemented
OR0788 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,489 $150,000 Not Implemented
SU0548 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $83,894 $0 Implemented