Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
405
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0258 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,136 | $1,400 | Not Implemented |
MZ0258 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,199 | $420 | Not Implemented |
MZ0258 # 07 Y:2018 | 07 | 2018 | USE OPTIMUM THICKNESS INSULATION | $4,597 | $2,989 | Not Implemented |
MZ0258 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,344 | $1,800 | Implemented |
MZ0258 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,883 | $6,200 | Not Implemented |
MZ0258 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,450 | $5,000 | Implemented |
MZ0228 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $1,772 | Implemented |
MZ0228 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,423 | $280 | Implemented |
MZ0228 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,062 | $0 | Implemented |
MZ0228 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,002 | $1,080 | Implemented |
MZ0228 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $625 | $651 | Not Implemented |
MZ0228 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $897 | $340 | Implemented |
MZ0159 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $1,973 | $1,599 | Implemented |
MZ0159 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $5,170 | $1,000 | Not Implemented |
MZ0159 # 04 Y:2014 | 04 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,895 | $37,500 | Implemented |
MZ0159 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $428 | $1,200 | Implemented |
MZ0159 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,788 | $23,000 | Implemented |
MZ0159 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $51,046 | $118,500 | Not Implemented |
MZ0149 # 03 Y:2014 | 03 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $9,091 | $25,000 | Not Implemented |
MZ0149 # 06 Y:2014 | 06 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $46,961 | $5,500 | Not Implemented |
MZ0149 # 05 Y:2014 | 05 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $14,550 | $28,000 | Not Implemented |
MZ0149 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $18,116 | $16,400 | Implemented |
MZ0149 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $4,128 | $6,040 | Implemented |
MZ0149 # 04 Y:2014 | 04 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,580 | $25,750 | Not Implemented |
MZ0146 # 01 Y:2014 | 01 | 2014 | REDUCE VENTILATION AIR | $14,453 | $0 | Implemented |