IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0314 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $443 $238 Implemented
IA0314 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,483 $26,776 Not Implemented
IA0314 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,549 $7,100 Not Implemented
IA0314 # 07 Y:2003 07 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $491 $520 Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
LL0156 # 01 Y:2003 01 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $944,111 $379,982 Not Implemented
LL0156 # 02 Y:2003 02 2003 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $918,298 $3,111,056 Not Implemented
LL0156 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $847,706 $1,220 Implemented
LL0156 # 04 Y:2003 04 2003 OPERATE BOILERS ON HIGH FIRE SETTING $103,102 $0 Not Implemented
LL0156 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $49,634 $3,890 Implemented
LL0156 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,003 $5,479 Implemented
LL0156 # 07 Y:2003 07 2003 REPAIR OR REPLACE STEAM TRAPS $343,385 $3,840 Implemented
AM0431 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23,400 $240 Implemented
AM0431 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,030 $11,900 Not Implemented
AM0431 # 03 Y:2003 03 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,480 $5,640 Implemented
AM0431 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Implemented
AM0431 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $1,790 Implemented
AM0431 # 06 Y:2003 06 2003 REDUCE HEAT GAIN BY WINDOW TINTING $1,720 $4,460 Not Implemented
AM0431 # 07 Y:2003 07 2003 $750 $0 Implemented
AM0431 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,150 $0 Implemented