IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,104

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0005 # 12 Y:2001 12 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,855 $277 Implemented
TA0005 # 13 Y:2001 13 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,580 $826 Implemented
TA0005 # 14 Y:2001 14 2001 INSULATE BARE EQUIPMENT $258 $249 Not Implemented
BD0183 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,081 $9,820 n/a
BD0183 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $3,950 $3,525 Not Implemented
BD0183 # 03 Y:2001 03 2001 REPAIR AND ELIMINATE STEAM LEAKS $1,710 $950 Not Implemented
BD0183 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $310 Not Implemented
BD0183 # 05 Y:2001 05 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $5,346 $4,500 Not Implemented
BD0183 # 06 Y:2001 06 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $840,000 $20,000 n/a
BD0183 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,230 $220 Not Implemented
BD0183 # 08 Y:2001 08 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $255 $220 Not Implemented
GT0710 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $300 Implemented
GT0710 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $4,030 Implemented
GT0710 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $2,450 Implemented
GT0710 # 04 Y:2001 04 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,125 $3,600 Not Implemented
GT0710 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,120 $6,932 Not Implemented
GT0710 # 06 Y:2001 06 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $423 $2,100 Not Implemented
GT0710 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $156,450 $5,200 Implemented
GT0710 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $560 $275 Not Implemented
SU0116 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Not Implemented
SU0116 # 02 Y:2001 02 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $18,236 $114,000 Not Implemented
SU0116 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $7,323 $979 Implemented
SU0116 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $5,330 $16,000 Not Implemented
SU0116 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $100 Implemented
SU0116 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $329 $0 Not Implemented