IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0151 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,792 $5,123 Implemented
SF0151 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,694 $5,068 Implemented
SF0151 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,820 $15,700 Implemented
SF0151 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,572 $8,872 Not Implemented
SF0151 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,404 $19,349 Not Implemented
SF0151 # 08 Y:1998 08 1998 TREAT AND REUSE RINSE WATERS $1,220 $4,835 Implemented
SF0151 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $187,200 $36,000 Implemented
SF0151 # 10 Y:1998 10 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,120 $6,210 Not Implemented
AS0236 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,320 $12,169 Not Implemented
AS0236 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $563 $425 Not Implemented
AS0236 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $60 Not Implemented
AS0236 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,972 $20 Not Implemented
AS0236 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,954 $3,800 Not Implemented
AS0236 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $266 $60 Not Implemented
AS0236 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,433 $9,200 Not Implemented
AS0236 # 08 Y:1998 08 1998 INSTALL TIMERS AND/OR THERMOSTATS $3,018 $1,725 Not Implemented
AS0236 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $120 $60 Not Implemented
AS0236 # 10 Y:1998 10 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,934 $1,560 Not Implemented
AS0236 # 11 Y:1998 11 1998 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $46,400 $2,180 Not Implemented
AS0236 # 12 Y:1998 12 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,487,526 $600,000 Not Implemented
ND0315 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,005 $550 Not Implemented
ND0315 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $840 Implemented
ND0315 # 03 Y:1998 03 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,863 $1,000 Implemented
ND0315 # 04 Y:1998 04 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,316 $3,500 Not Implemented
ND0315 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $600 Not Implemented