IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0490 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,692 $1,922 Not Implemented
NC0490 # 05 Y:2013 05 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,690 $65,000 Implemented
NC0490 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $50 Implemented
NC0490 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,508 $1,217 Implemented
NC0490 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $3,207 $5,500 Implemented
NC0490 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,135 $2,192 Implemented
NC0406 # 01 Y:2010 01 2010 $77,083 $85,000 Not Implemented
NC0406 # 02 Y:2010 02 2010 TREAT AND REUSE RINSE WATERS $51,487 $8,875 Not Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0406 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,210 $15,045 Not Implemented
NC0406 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,747 $8,000 Not Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 10 Y:2010 10 2010 $276,388 $214,700 Implemented
NC0406 # 11 Y:2010 11 2010 $20,625 $50,000 Implemented
NC0345 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,498 $4,000 Not Implemented
NC0345 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,488 $8,000 Not Implemented
NC0345 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,461 $4,000 Not Implemented
NC0345 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,300 $50 Not Implemented
NC0345 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $2,465 Not Implemented
NC0345 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $147 $95 Not Implemented
NC0345 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $291 $95 Implemented
NC0277 # 01 Y:2004 01 2004 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $40,000 $1,000 Not Implemented