Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2416 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,542 | $1,170 | n/a |
UL2416 # 10 Y:2024 | 10 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,389 | $25,000 | n/a |
UL2416 # 11 Y:2024 | 11 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,389 | $10,000 | n/a |
UL2416 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $1,600 | n/a |
UL2416 # 03 Y:2024 | 03 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $276 | $0 | n/a |
UL2416 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $20,797 | $16,250 | n/a |
UL2416 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $273 | n/a |
UL2416 # 06 Y:2024 | 06 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $23,980 | $43,234 | n/a |
UL2416 # 13 Y:2024 | 13 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,610 | $190,384 | n/a |
UL2416 # 07 Y:2024 | 07 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $743 | $660 | n/a |
UL2416 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,134 | $330 | n/a |
UL2416 # 05 Y:2024 | 05 | 2024 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $4,975 | $8,000 | n/a |
UL2416 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $139 | $469 | n/a |
UL2407 # 07 Y:2024 | 07 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,307 | $10,000 | n/a |
UL2407 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,908 | $5,457 | n/a |
UL2407 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $34,496 | $23,699 | n/a |
UL2407 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,264 | $788,082 | n/a |
UL2407 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,343 | $0 | n/a |
UL2407 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $184 | $342 | n/a |
UL2407 # 05 Y:2024 | 05 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $41,469 | $69,175 | n/a |
UL2405 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,858 | $3,659 | n/a |
UL2405 # 10 Y:2024 | 10 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,845 | $13,000 | n/a |
UL2405 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,806 | $233,239 | n/a |
UL2405 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,682 | $13,000 | n/a |
UL2405 # 08 Y:2024 | 08 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,710 | $0 | n/a |