Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
151
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0431 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,065 | $1,274,840 | n/a |
MS0431 # 03 Y:2024 | 03 | 2024 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $2,111 | $124,000 | n/a |
MS0431 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $57,233 | $175,000 | n/a |
MS0406 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $17,347 | $165,000 | Not Implemented |
MS0406 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,220 | $0 | Implemented |
MS0406 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,570 | $0 | Not Implemented |
TT0187 # 04 Y:2017 | 04 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,000 | $3,000 | Implemented |
TT0187 # 07 Y:2017 | 07 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,097 | $1,000 | Not Implemented |
TT0187 # 03 Y:2017 | 03 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $24,005 | $30,000 | Implemented |
TT0187 # 01 Y:2017 | 01 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $77,734 | $24,500 | Not Implemented |
TT0187 # 06 Y:2017 | 06 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,126 | $2,000 | Not Implemented |
TT0187 # 09 Y:2017 | 09 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,046 | $3,200 | Not Implemented |
TT0187 # 08 Y:2017 | 08 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $0 | Implemented |
TT0187 # 05 Y:2017 | 05 | 2017 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $8,095 | $1,311 | Implemented |
TT0187 # 02 Y:2017 | 02 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $52,000 | $14,250 | Implemented |
MS0371 # 05 Y:2011 | 05 | 2011 | OPTIMIZE PLANT POWER FACTOR | $6,211 | $30,420 | Not Implemented |
MS0371 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,866 | $2,431 | Not Implemented |
MS0371 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,774 | $19,214 | Not Implemented |
MS0371 # 03 Y:2011 | 03 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,839 | $8,380 | Not Implemented |
MS0371 # 04 Y:2011 | 04 | 2011 | INCREASE AMOUNT OF CONDENSATE RETURNED | $7,004 | $11,785 | Not Implemented |
MS0371 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,056 | $11,255 | Not Implemented |
MS0371 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $930 | $386 | Not Implemented |
MS0360 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $244,785 | $930,000 | Not Implemented |
MS0360 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,795 | $240,500 | Implemented |
MS0360 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,606 | $18,481 | Not Implemented |