Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0088 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $92 | $80 | Implemented |
NL0088 # 01 Y:2023 | 01 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,754 | $50,000 | Not Implemented |
NL0088 # 03 Y:2023 | 03 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,828 | $160 | Implemented |
NL0088 # 02 Y:2023 | 02 | 2023 | METER WASTE WATER | $4,109 | $320 | Implemented |
NL0088 # 05 Y:2023 | 05 | 2023 | MINIMIZE WATER USAGE | $311 | $230 | Implemented |
NL0088 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $988 | $40 | Implemented |
NL0072 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,761 | $20,400 | Implemented |
NL0072 # 03 Y:2022 | 03 | 2022 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $2,055 | $266 | Implemented |
NL0072 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $773 | $1,445 | Not Implemented |
NL0072 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $18,966 | $23,925 | Implemented |
NL0061 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $967 | $1,650 | Not Implemented |
NL0061 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $3,432 | $3,500 | Implemented |
NL0061 # 04 Y:2022 | 04 | 2022 | METER WASTE WATER | $3,714 | $580 | Not Implemented |
NL0061 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,939 | $70 | Implemented |
NL0061 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,080 | $70 | Implemented |
NL0061 # 01 Y:2022 | 01 | 2022 | METER WASTE WATER | $9,914 | $580 | Not Implemented |
NL0061 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $595 | $1,289 | Implemented |
NL0061 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $2,500 | Implemented |
NL0056 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $1,169 | $770 | Implemented |
NL0056 # 01 Y:2021 | 01 | 2021 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $222,300 | $82,500 | Implemented |
NL0056 # 03 Y:2021 | 03 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $8,331 | $4,500 | Not Implemented |
NL0056 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,013 | $11,549 | Implemented |
NL0056 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,032 | $1,600 | Implemented |
NL0041 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,670 | $100 | Implemented |
NL0041 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $674 | Implemented |