Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
305
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0241 # 08 Y:2003 | 08 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,103 | $1,102 | Not Implemented |
MS0241 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,802 | $8,788 | n/a |
MS0241 # 04 Y:2003 | 04 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,644 | $760 | Implemented |
MS0241 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,854 | $3,600 | Implemented |
MS0241 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,062 | $2,486 | Not Implemented |
MS0241 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,378 | $129 | Implemented |
MS0241 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,721 | $7,328 | Not Implemented |
MS0241 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $30,220 | $20,410 | Implemented |
MS0241 # 07 Y:2003 | 07 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,613 | $0 | Implemented |
MS0241 # 10 Y:2003 | 10 | 2003 | INSTALL OCCUPANCY SENSORS | $1,004 | $416 | Not Implemented |
MS0241 # 11 Y:2003 | 11 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $856 | $1,575 | Not Implemented |
SU0170 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,666 | $16,761 | Not Implemented |
SU0170 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,181 | $47 | Implemented |
SU0170 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,210 | $0 | Not Implemented |
SU0170 # 03 Y:2003 | 03 | 2003 | ADVERTISE PRODUCT OR SERVICE | $31,250 | $1,000 | Implemented |
SU0170 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,400 | $0 | Not Implemented |
SU0170 # 08 Y:2003 | 08 | 2003 | REPLACE BOILER | $10,809 | $33,514 | Not Implemented |
SU0170 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $57 | Implemented |
SU0170 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $185 | Implemented |
IC0069 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,983 | $8,812 | Implemented |
IC0069 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,894 | $10,560 | Implemented |
IC0069 # 05 Y:2003 | 05 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $6,176 | $341 | Implemented |
IC0069 # 06 Y:2003 | 06 | 2003 | REDESIGN PROCESS | $579 | $1,984 | Not Implemented |
IC0069 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,894 | $5,280 | Implemented |
IC0069 # 08 Y:2003 | 08 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,618 | $251,040 | Not Implemented |