IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,116

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0111 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,329 $607 Implemented
NV0111 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,922 $48,995 Not Implemented
SD0189 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,155 $22,250 Implemented
SD0189 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $543,061 $1,420,250 Not Implemented
SD0189 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,455 $6,625 Not Implemented
SD0189 # 04 Y:1998 04 1998 USE OPTIMUM THICKNESS INSULATION $678 $219 Implemented
SD0189 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,587 $5,358 Implemented
SD0189 # 06 Y:1998 06 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $4,788 $5,180 Not Implemented
SD0189 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,780 $8,500 Implemented
SD0189 # 08 Y:1998 08 1998 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $180,000 $27,000 Not Implemented
OK0531 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $21,470 $0 Not Implemented
OK0531 # 02 Y:1997 02 1997 DISCONNECT BALLASTS $1,079 $500 Implemented
OK0531 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $1,870 Not Implemented
OK0531 # 04 Y:1997 04 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,000 $0 Implemented
OK0531 # 05 Y:1997 05 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $27,300 $0 Not Implemented
OK0531 # 06 Y:1997 06 1997 MOVE PRODUCT USING MECHANICAL MEANS $27,300 $150,000 Not Implemented
CO0391 # 01 Y:1997 01 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,130 $3,710 Implemented
CO0391 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $302 $403 Implemented
CO0391 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,479 $2,216 Implemented
CO0391 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $430 $480 Not Implemented
CO0391 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,230 $27,230 Implemented
CO0391 # 06 Y:1997 06 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,620 $23,500 Not Implemented
OR0288 # 01 Y:1997 01 1997 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,130 $32,400 Implemented
OR0288 # 02 Y:1997 02 1997 CLEAN CONDENSER TUBES $1,270 $5,000 Implemented
OR0288 # 03 Y:1997 03 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,140 $0 Implemented