Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 n/a
KS2321 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,979 $30 n/a
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 n/a
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 n/a
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 n/a
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 n/a
KS2321 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,362 $3,175 n/a
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 n/a
GT0790 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,970 Implemented
GT0790 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,365 $3,895 Not Implemented
GT0790 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,000 $300,000 Not Implemented
GT0790 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,972 $0 Implemented
GT0790 # 01 Y:2004 01 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $300 Not Implemented
GT0790 # 02 Y:2004 02 2004 $3,294 $21,890 Not Implemented
GT0790 # 04 Y:2004 04 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $130 $200 Not Implemented
GT0746 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,357 $20,000 Not Implemented
GT0746 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,422 $0 Not Implemented
GT0746 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,113 $28,000 Not Implemented
GT0746 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,932 $44,000 Not Implemented
GT0746 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $0 Implemented
GT0746 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,222 $14,500 Not Implemented
GT0746 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,727 $2,500 Implemented
GT0746 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $227 $150 Not Implemented
GT0735 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $55,394 $0 Not Implemented
GT0735 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $3,933 $2,675 Not Implemented