IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0261 # 06 Y:1999 06 1999 $3,640 $3,700 Implemented
MO0261 # 04 Y:1999 04 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $700 $0 Implemented
MO0191 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,247 $80 Implemented
MO0191 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,490 $250 Implemented
MO0191 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $5,576 Implemented
MO0191 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $1,410 Implemented
MO0191 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $0 Implemented
MO0191 # 01 Y:1996 01 1996 $47,917 $136,000 Implemented
MO0185 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $2,810 $560 Implemented
MO0185 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,247 $1,576 Implemented
MO0185 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $449 Implemented
KU0326 # 01 Y:1990 01 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,883 $450 Implemented
KU0326 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $706 $520 Implemented
KU0326 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $100 Implemented
KU0326 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $317 $100 Implemented
KU0326 # 07 Y:1990 07 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $0 Implemented
KU0326 # 10 Y:1990 10 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
OK0154 # 08 Y:1985 08 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,324 $171 Implemented
OK0154 # 09 Y:1985 09 1985 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $4,309 $13,674 Implemented
OK0154 # 10 Y:1985 10 1985 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $959,738 $1,018,080 Implemented
OK0154 # 07 Y:1985 07 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,382 $891 Implemented
OK0154 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,402 $410 Implemented
OK0154 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $1,142 Implemented
OK0154 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,917 $500 Implemented
OK0154 # 01 Y:1985 01 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,315 $12,158 Implemented