IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0993 # 01 Y:2025 01 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,885 $200 n/a
GT0993 # 09 Y:2025 09 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $89 $363 n/a
GT0993 # 10 Y:2025 10 2025 OPTIMIZE PLANT POWER FACTOR $6,294 $26,910 n/a
GT0993 # 11 Y:2025 11 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $162,880 $1,659,784 n/a
GT0993 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $2,306 $2,763 n/a
GT0993 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $643 $600 n/a
GT0993 # 06 Y:2025 06 2025 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $916 $788 n/a
GT0993 # 05 Y:2025 05 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,717 $1,200 n/a
GT0993 # 04 Y:2025 04 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,579 $600 n/a
GT0993 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,254 $1,850 n/a
GT0993 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,903 $200 n/a
KS2321 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,979 $30 Not Implemented
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 Implemented
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 Implemented
KS2321 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,362 $3,175 Not Implemented
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 Not Implemented
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 Implemented
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 Not Implemented
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 Implemented
GT0790 # 04 Y:2004 04 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $130 $200 Not Implemented
GT0790 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,000 $300,000 Not Implemented
GT0790 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,970 Implemented
GT0790 # 02 Y:2004 02 2004 PURCHASE EQUIPMENT INSTEAD OF LEASING $3,294 $21,890 Not Implemented
GT0790 # 01 Y:2004 01 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $300 Not Implemented
GT0790 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,365 $3,895 Not Implemented