Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
840
matching recommendationsSIC | 2819 | Industrial Inorganic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0112 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,114 | $0 | Implemented |
IC0111 # 01 Y:2006 | 01 | 2006 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $803,012 | $258,000 | Implemented |
IC0111 # 02 Y:2006 | 02 | 2006 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $95,000 | $442,680 | Not Implemented |
IC0111 # 03 Y:2006 | 03 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $186,788 | $135,156 | Not Implemented |
IC0111 # 04 Y:2006 | 04 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $93,000 | $235,998 | Implemented |
IC0111 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,047 | $30,000 | Not Implemented |
IC0111 # 06 Y:2006 | 06 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $57,000 | $36,000 | Not Implemented |
IC0111 # 07 Y:2006 | 07 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $22,776 | $0 | Implemented |
IC0111 # 08 Y:2006 | 08 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $9,304 | $2,800 | Implemented |
IC0111 # 09 Y:2006 | 09 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $158,427 | $5,152 | Implemented |
IC0111 # 10 Y:2006 | 10 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,406 | $19,704 | Implemented |
IC0111 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,163 | $1,600 | Implemented |
IC0111 # 12 Y:2006 | 12 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $45,671 | $195,432 | Implemented |
IC0103 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,792 | $12,792 | Not Implemented |
IC0103 # 02 Y:2005 | 02 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,631 | $4,680 | Not Implemented |
IC0103 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,344 | $1,400 | Not Implemented |
IC0103 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,340 | $300 | Not Implemented |
IC0103 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $0 | Not Implemented |
IC0103 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,336 | $941 | Not Implemented |
IC0103 # 07 Y:2005 | 07 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $330 | $2,800 | Not Implemented |
IC0103 # 08 Y:2005 | 08 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $104 | $256 | Not Implemented |
MS0256 # 01 Y:2004 | 01 | 2004 | INSTALL HYDROGEN FUEL CELL | $711,668 | $7,500,000 | n/a |
MS0256 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $53,846 | $54,000 | n/a |
MS0256 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $34,367 | $1,000 | Implemented |
MS0256 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,725 | $3,794 | Implemented |