Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
840
matching recommendationsSIC | 2819 | Industrial Inorganic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2510 # 06 Y:2025 | 06 | 2025 | ADJUST BURNERS FOR EFFICIENT OPERATION | $62,919 | $100,000 | n/a |
LS2510 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,682 | $21,000 | n/a |
LS2510 # 04 Y:2025 | 04 | 2025 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $24,480 | $14,000 | n/a |
LS2510 # 07 Y:2025 | 07 | 2025 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,760 | $4,900 | n/a |
GT0993 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,885 | $200 | n/a |
GT0993 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,579 | $600 | n/a |
GT0993 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,254 | $1,850 | n/a |
GT0993 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,903 | $200 | n/a |
GT0993 # 05 Y:2025 | 05 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,717 | $1,200 | n/a |
GT0993 # 10 Y:2025 | 10 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,294 | $26,910 | n/a |
GT0993 # 06 Y:2025 | 06 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $916 | $788 | n/a |
GT0993 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $643 | $600 | n/a |
GT0993 # 09 Y:2025 | 09 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $89 | $363 | n/a |
GT0993 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $2,306 | $2,763 | n/a |
GT0993 # 11 Y:2025 | 11 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $162,880 | $1,659,784 | n/a |
AM0937 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $47,464 | $107,580 | n/a |
AM0937 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $305 | $1,440 | n/a |
AM0937 # 03 Y:2025 | 03 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $90,235 | $351,150 | n/a |
AM0937 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,025 | $450,534 | n/a |
AM0937 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $63,000 | $15,000 | n/a |
WV0669 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,909 | $6,900 | Not Implemented |
WV0669 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $19,270 | $9,950 | Implemented |
WV0669 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,442 | $5,225 | Implemented |
WV0669 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,542 | $14,640 | Not Implemented |
WV0669 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,884 | $35,717 | Not Implemented |