IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0672 # 10 Y:2025 10 2025 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $43,311 $4,700 n/a
SD0672 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,737 $8,530 n/a
SD0672 # 08 Y:2025 08 2025 RECOVER WASTE HEAT FROM EQUIPMENT $21,315 $2,000 n/a
SD0672 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,804 $3,518 n/a
SD0672 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,016 $8,765 n/a
SD0672 # 07 Y:2025 07 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,634 $0 n/a
SD0672 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $24,489 $112,796 n/a
SD0672 # 02 Y:2025 02 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $11,678 $2,631 n/a
SD0672 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $565 $847 n/a
SD0672 # 04 Y:2025 04 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,349 $0 n/a
SD0537 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,758 $5,550 Not Implemented
SD0537 # 10 Y:2016 10 2016 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,205 $2,550 Not Implemented
SD0537 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,312 $3,610 Implemented
SD0537 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,109 $108,180 Not Implemented
SD0537 # 02 Y:2016 02 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $21,873 $21,829 Not Implemented
SD0537 # 06 Y:2016 06 2016 REDUCE HEAT GAIN BY WINDOW TINTING $2,089 $7,880 Not Implemented
SD0537 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,432 $4,070 Not Implemented
SD0537 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,320 $22,960 Not Implemented
SD0537 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,406 $10,314 Implemented
SD0537 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $10,293 $10,000 Not Implemented
SF0248 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,662 $0 Implemented
SF0248 # 02 Y:2002 02 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,169 $1,436 Not Implemented
SF0248 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,713 $1,685 Implemented
SF0248 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $5,341 $6,000 Implemented
SF0248 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $513 $700 Not Implemented