Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 2819 | Industrial Inorganic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0159 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,635 | $20 | Implemented |
LL0159 # 03 Y:2003 | 03 | 2003 | USE PHOTOCELL CONTROLS | $19,066 | $924 | Implemented |
LL0159 # 02 Y:2003 | 02 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $217,796 | $12,400 | Implemented |
LL0159 # 01 Y:2003 | 01 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $336,249 | $481,633 | Not Implemented |
LL0159 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $4,821 | $1,204 | Not Implemented |
LL0159 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $4,389 | $642 | Implemented |
LL0159 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $940 | $525 | Not Implemented |
MA0539 # 01 Y:2003 | 01 | 2003 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,787 | $12,870 | Not Implemented |
MA0539 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,957 | $650 | Implemented |
MA0539 # 03 Y:2003 | 03 | 2003 | REDUCE VENTILATION AIR | $301 | $800 | Implemented |
MA0539 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $0 | Implemented |
MA0539 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $63 | $93 | Not Implemented |
AS0360 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $344 | $1,350 | Not Implemented |
AS0360 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $10,607 | Implemented |
AS0360 # 07 Y:2003 | 07 | 2003 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $2,438 | $8,705 | Not Implemented |
AS0360 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $301 | $616 | Implemented |
AS0360 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,253 | $150 | Implemented |
AS0360 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $10,463 | $18,810 | n/a |
AS0360 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,496 | $30 | Implemented |
TA0058 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $400 | Implemented |
TA0058 # 01 Y:2003 | 01 | 2003 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $15,460 | $0 | Implemented |
TA0058 # 03 Y:2003 | 03 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $2,500 | $100 | Implemented |
TA0058 # 04 Y:2003 | 04 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,800 | $0 | Implemented |
TA0058 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $0 | Implemented |
TA0058 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $190 | $123 | Not Implemented |