IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

660

matching recommendations
Reset
SIC 282 Plastics Materials And Synthetics
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0791 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,079 $5,750 Implemented
OR0791 # 01 Y:2024 01 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $29,053 $352,000 Implemented
WV0664 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,056 $426 Implemented
WV0664 # 09 Y:2024 09 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $382 $328 Implemented
WV0664 # 06 Y:2024 06 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $792 $1,500 Implemented
WV0664 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $911 $1,030 Implemented
WV0664 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $535 $1,139 Implemented
WV0664 # 10 Y:2024 10 2024 INSULATE BARE EQUIPMENT $121 $293 Implemented
WV0664 # 01 Y:2024 01 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,899 $1,019 Implemented
WV0664 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $222 Implemented
UA0285 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $757 $411 Implemented
UA0285 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $159 $301 Implemented
OR0788 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $126,866 $2,500,000 Implemented
UF0609 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,546 $9,000 Implemented
UF0609 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,116 $322,608 Implemented
UF0609 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,360 $25,380 Implemented
UF0609 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,174 $25,504 Implemented
UF0609 # 06 Y:2024 06 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $35,940 $0 Implemented
TT0303 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $896 $100 Implemented
TT0303 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,197 $2,025 Implemented
TT0303 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $33,678 $1,200 Implemented
TT0303 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,135 $0 Implemented
TT0303 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $11,430 $3,000 Implemented
OR0772 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,740 $3,039 Implemented
OR0772 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,514 $8,385 Implemented