Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,517
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0121 # 17 Y:2018 | 17 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $385 | Implemented |
LE0453 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $70,484 | $4,500 | Implemented |
LE0453 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,972 | $1,125 | Not Implemented |
LE0453 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,248 | $4,000 | Not Implemented |
LE0453 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,037 | $1,550 | Not Implemented |
LE0453 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,938 | Implemented |
LE0453 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,507 | $11,250 | Implemented |
LE0453 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,514 | $19,688 | Implemented |
LE0453 # 08 Y:2018 | 08 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,940 | $105,000 | Not Implemented |
LS1801 # 01 Y:2018 | 01 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $69,575 | $0 | Implemented |
LS1801 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,691 | $0 | Not Implemented |
LS1801 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $54,034 | $0 | Not Implemented |
UU0125 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,690 | $0 | Not Implemented |
UU0125 # 07 Y:2017 | 07 | 2017 | MINIMIZE WATER USAGE | $3,700 | $200 | Implemented |
UU0125 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $4,418 | $7,220 | Implemented |
UU0125 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,417 | $39,198 | Not Implemented |
UU0125 # 04 Y:2017 | 04 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $6,187 | $3,150 | Implemented |
UU0125 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,110 | $20 | Not Implemented |
UU0125 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,851 | $18,588 | Implemented |
UU0125 # 01 Y:2017 | 01 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,802 | $0 | Not Implemented |
MA0778 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $93,550 | $132,200 | Not Implemented |
MA0778 # 02 Y:2017 | 02 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,208 | $14,500 | Implemented |
MA0778 # 03 Y:2017 | 03 | 2017 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $17,175 | $73,000 | Implemented |
MA0778 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,137 | $11,649 | Implemented |
MA0778 # 05 Y:2017 | 05 | 2017 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $8,708 | $9,000 | Not Implemented |