IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

514

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0160 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,924 $17,420 Implemented
IC0160 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292 $653 Implemented
IC0160 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,819 $131,206 Implemented
IC0160 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,221 $42,838 Implemented
IC0160 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,043 $345 Implemented
IC0160 # 08 Y:2009 08 2009 REPAIR AND ELIMINATE STEAM LEAKS $746 $58 Implemented
IC0160 # 10 Y:2009 10 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $179 $0 Implemented
UW0026 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,086 $19,000 Implemented
UW0026 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,037 $0 Implemented
UW0026 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $200 Implemented
UW0026 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,522 $19,854 Implemented
DL0025 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,976 $0 Implemented
DL0025 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $36,900 $0 Implemented
DL0025 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,919 $30,000 Implemented
OR0534 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,794 $0 Implemented
OR0534 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,768 $6,825 Implemented
OR0534 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $0 Implemented
OR0534 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,219 $2,510 Implemented
OR0534 # 10 Y:2008 10 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $808 Implemented
DL0017 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $800 Implemented
DL0017 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,006 $26,496 Implemented
DL0013 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,300 $0 Implemented
DL0013 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,396 $285 Implemented
DL0013 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $108,300 $104,800 Implemented
DL0013 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $24,218 $25,000 Implemented