Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
531
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0128 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $18,200 | $12,560 | Implemented |
DL0128 # 05 Y:2014 | 05 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,000 | $20,000 | Implemented |
DL0126 # 01 Y:2014 | 01 | 2014 | ADOPT IN-HOUSE MATERIAL GENERATION | $283,400 | $116,500 | Implemented |
DL0126 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $7,400 | Implemented |
DL0118 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,500 | $349,314 | Implemented |
DL0118 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,300 | $3,000 | Implemented |
DL0118 # 06 Y:2013 | 06 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,500 | $0 | Implemented |
DL0118 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,504 | $20,000 | Implemented |
DL0118 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $3,600 | $1,000 | Implemented |
OK0856 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,300 | $750 | Implemented |
WV0472 # 02 Y:2013 | 02 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $18,055 | $9,134 | Implemented |
WV0472 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,864 | $10,474 | Implemented |
WV0472 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,870 | $13,557 | Implemented |
WV0472 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,173 | $11,980 | Implemented |
WV0472 # 08 Y:2013 | 08 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,509 | $1,000 | Implemented |
WV0472 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,230 | $1,700 | Implemented |
WV0472 # 10 Y:2013 | 10 | 2013 | INSULATE BARE EQUIPMENT | $3,020 | $3,318 | Implemented |
WV0472 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,824 | $356 | Implemented |
WV0472 # 13 Y:2013 | 13 | 2013 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,094 | $38 | Implemented |
WV0472 # 14 Y:2013 | 14 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,023 | $76 | Implemented |
WV0472 # 16 Y:2013 | 16 | 2013 | REDUCE EXCESS STEAM BLEEDING | $452 | $2,152 | Implemented |
WV0472 # 17 Y:2013 | 17 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $337 | $700 | Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |