Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
514
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0472 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,824 | $356 | Implemented |
WV0472 # 13 Y:2013 | 13 | 2013 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,094 | $38 | Implemented |
WV0472 # 14 Y:2013 | 14 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,023 | $76 | Implemented |
WV0472 # 16 Y:2013 | 16 | 2013 | REDUCE EXCESS STEAM BLEEDING | $452 | $2,152 | Implemented |
WV0472 # 17 Y:2013 | 17 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $337 | $700 | Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |
MZ0105 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,288 | $2,000 | Implemented |
NC0461 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,912 | $7,160 | Implemented |
NC0461 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $24,541 | $2,400 | Implemented |
NC0461 # 05 Y:2012 | 05 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $84,150 | $40,000 | Implemented |
NC0461 # 06 Y:2012 | 06 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,695 | $0 | Implemented |
NC0461 # 08 Y:2012 | 08 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $458,904 | $314,375 | Implemented |
SU0321 # 02 Y:2012 | 02 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $206 | $669 | Implemented |
SU0321 # 03 Y:2012 | 03 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $124 | $395 | Implemented |
SU0321 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,346 | $123,757 | Implemented |
SU0321 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $955 | $4,144 | Implemented |
SU0321 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,284 | $1,655 | Implemented |
SU0321 # 08 Y:2012 | 08 | 2012 | ELIMINATE/REDUCE AN OPERATION | $2,320 | $4,530 | Implemented |
MI0223 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,207 | $2,520 | Implemented |
MI0223 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |
MI0223 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,824 | $4,510 | Implemented |
MI0223 # 10 Y:2012 | 10 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,496 | $1,800 | Implemented |
MI0223 # 11 Y:2012 | 11 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $401 | $1,103 | Implemented |