Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,210
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0174 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,500 | $25,000 | Not Implemented |
DL0174 # 08 Y:2017 | 08 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $630 | $2,000 | Not Implemented |
DL0174 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,220 | $34,080 | Not Implemented |
UF0505 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $715,231 | $1,700,000 | Not Implemented |
UF0505 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $152,736 | $200,000 | Implemented |
UF0505 # 03 Y:2017 | 03 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $18,902 | $2,800 | Implemented |
UF0505 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $13,763 | $120 | Implemented |
UF0505 # 05 Y:2017 | 05 | 2017 | INSTALL TURBULATORS | $12,705 | $7,500 | Not Implemented |
UF0505 # 06 Y:2017 | 06 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $7,831 | $1,081 | Implemented |
UF0505 # 07 Y:2017 | 07 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,374 | $4,000 | Not Implemented |
UF0505 # 08 Y:2017 | 08 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $4,554 | $1,592 | Implemented |
SU0432 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,735 | $0 | Not Implemented |
SU0432 # 02 Y:2017 | 02 | 2017 | DISCONNECT BALLASTS | $1,881 | $0 | Not Implemented |
SU0432 # 03 Y:2017 | 03 | 2017 | ELIMINATE/REDUCE AN OPERATION | $22,179 | $350 | Not Implemented |
SU0432 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $906 | $968 | Not Implemented |
SU0432 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,680 | $5,451 | Not Implemented |
SU0432 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,489 | $22,737 | Not Implemented |
SU0432 # 07 Y:2017 | 07 | 2017 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $115 | $551 | Not Implemented |
AM0718 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $123,800 | $195,000 | Not Implemented |
AM0718 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $53,431 | $280,072 | Not Implemented |
AM0718 # 03 Y:2016 | 03 | 2016 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $65,900 | $400,000 | Not Implemented |
AM0718 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $28,832 | $0 | Implemented |
AM0718 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $10,555 | $1,800 | Not Implemented |
WV0535 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,812 | $8,931 | Not Implemented |
WV0535 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $4,153 | $511 | Implemented |