IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0338 # 04 Y:2006 04 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,133 $1,000 Implemented
WV0338 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,593 $0 Implemented
WV0338 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,611 $45 Implemented
WV0338 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $2,505 $709 Implemented
WV0338 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,078 $8 Implemented
WV0338 # 09 Y:2006 09 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,916 $4,108 Not Implemented
WV0338 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,289 $820 Implemented
WV0338 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,129 $590 Implemented
WV0338 # 12 Y:2006 12 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,013 $210 Implemented
WV0338 # 13 Y:2006 13 2006 INSTALL OCCUPANCY SENSORS $983 $580 Implemented
WV0338 # 14 Y:2006 14 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $814 $1,740 Not Implemented
WV0338 # 15 Y:2006 15 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $310 $0 Implemented
LE0208 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $214,649 $548,400 Not Implemented
LE0208 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $2,500 Implemented
LE0208 # 03 Y:2005 03 2005 $25,000 $460 Implemented
LE0208 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,745 $1,250 Implemented
LE0208 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,758 $2,500 Implemented
LE0208 # 06 Y:2005 06 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,676 $1,000 Implemented
LE0208 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,869 $750 Implemented
LE0208 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,927 $450 Not Implemented
LE0208 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,060 $145 Implemented
MA0570 # 01 Y:2005 01 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,944 $79,014 Not Implemented
MA0570 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $27,226 $1,624 Implemented
MA0570 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,028 $21,736 Implemented
MA0570 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,182 $20,800 Not Implemented