IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0593 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $32,448 $3,843 Not Implemented
SD0593 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,043 $24,602 Not Implemented
SD0593 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,483 $0 Implemented
SF0547 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,962 $360 Implemented
SF0547 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $3,114 $6,574 Implemented
SF0547 # 04 Y:2019 04 2019 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,499 $960 Not Implemented
SF0547 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,284 $0 Implemented
SF0547 # 10 Y:2019 10 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $120,071 $1,107,885 Not Implemented
SF0547 # 08 Y:2019 08 2019 AIR CONDITION ONLY SPACE NECESSARY $17,743 $33,601 Implemented
SF0547 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,069 $7,542 Not Implemented
SF0547 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,127 $1,647 Implemented
SF0547 # 05 Y:2019 05 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $40,841 $4,800 Not Implemented
SF0547 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,625 $240 Implemented
SF0284 # 10 Y:2004 10 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,103 $50,000 Not Implemented
SF0284 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,202 $2,331 Implemented
SF0284 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $46,318 $4,640 Not Implemented
SF0284 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,601 $3,625 Not Implemented
SF0284 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $554 $1,152 Not Implemented
SF0284 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,300 $3,000 Implemented
SF0284 # 07 Y:2004 07 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $39,674 $43,664 Not Implemented
SF0284 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,661 $1,900 Not Implemented
SF0284 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,841 $8,312 Not Implemented
SF0284 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,065 $3,065 Not Implemented
SF0284 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,933 $12,763 Implemented
SF0228 # 12 Y:2002 12 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,230 $19,300 Not Implemented