Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0332 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,961 | $200,000 | Implemented |
MZ0332 # 07 Y:2022 | 07 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,524 | $7,544 | Not Implemented |
MZ0332 # 06 Y:2022 | 06 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,198 | $720 | Not Implemented |
MZ0332 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $506 | $780 | Not Implemented |
MZ0332 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,330 | Implemented |
MZ0332 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,554 | $7,980 | Not Implemented |
MZ0332 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,851 | $670,334 | Not Implemented |
MZ0332 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,571 | $18,580 | Implemented |
MZ0159 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $1,973 | $1,599 | Implemented |
MZ0159 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $51,046 | $118,500 | Not Implemented |
MZ0159 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $428 | $1,200 | Implemented |
MZ0159 # 04 Y:2014 | 04 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,895 | $37,500 | Implemented |
MZ0159 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,788 | $23,000 | Implemented |
MZ0159 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $5,170 | $1,000 | Not Implemented |
MZ0105 # 11 Y:2012 | 11 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $1 | $1 | Not Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 03 Y:2012 | 03 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,339 | $13,500 | Not Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |
MZ0105 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $58,099 | $39,870 | Not Implemented |
MZ0105 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $920 | $1,160 | Not Implemented |
MZ0105 # 06 Y:2012 | 06 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $42,514 | $318,000 | Not Implemented |
MZ0105 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,476 | $1,140 | Not Implemented |
MZ0105 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,462 | $115,696 | Not Implemented |
MZ0105 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,288 | $2,000 | Implemented |