IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1063 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $3,994 $10,500 n/a
UD1063 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $170 $200 n/a
UD1063 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,201 $2,583 n/a
UD1063 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $461 $952 n/a
UD1063 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $0 n/a
UD1063 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,244 $297 n/a
UD1063 # 04 Y:2023 04 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,227 $2,191 n/a
WV0574 # 03 Y:2019 03 2019 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,375 $3,276 Not Implemented
WV0574 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $1,725 Implemented
WV0574 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $615 $2,100 Not Implemented
WV0574 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $14,108 $10,162 Implemented
WV0574 # 01 Y:2019 01 2019 REVISE RAW MATERIAL SPECS $26,910 $52,500 Not Implemented
WV0574 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $9,048 $8,000 Not Implemented
WV0574 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,235 $0 Implemented
WV0574 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $2,811 $540 Implemented
WV0574 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,691 $46 Implemented
WV0535 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,538 $578 Implemented
WV0535 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $2,918 $4,500 Not Implemented
WV0535 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $138 Implemented
WV0535 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $298 Implemented
WV0535 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $4,153 $511 Implemented
WV0535 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,030 $6,200 Not Implemented
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
WV0535 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $2,120 Implemented
WV0535 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $691 $30 Implemented