Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0833 # 02 Y:2006 | 02 | 2006 | ELIMINATE/REDUCE AN OPERATION | $137,445 | $0 | Not Implemented |
GT0833 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,153 | $0 | Not Implemented |
GT0833 # 04 Y:2006 | 04 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,806 | $18,000 | Not Implemented |
GT0833 # 05 Y:2006 | 05 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $29,400 | $0 | Implemented |
GT0833 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,653 | $550 | Not Implemented |
GT0833 # 07 Y:2006 | 07 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,204 | $0 | Implemented |
GT0833 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,891 | $62,250 | Not Implemented |
GT0833 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $870,069 | $100,000 | Not Implemented |
OK0739 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $139,230 | $39,852 | Not Implemented |
OK0739 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,798 | $9,750 | Implemented |
OK0739 # 02 Y:2006 | 02 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,872 | $2,175,000 | Not Implemented |
OK0739 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,090 | $7,944 | Implemented |
OK0739 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,011 | $390 | Not Implemented |
OK0739 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,587 | $191 | Implemented |
OK0739 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,734 | $9,485 | Not Implemented |
UM0315 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,713 | $40,991 | Not Implemented |
UM0315 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $53,281 | $1,800 | Not Implemented |
UM0315 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $36,263 | $15,000 | Not Implemented |
UM0315 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,667 | $8,066 | Not Implemented |
UM0315 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $32,300 | $80,207 | Not Implemented |
UM0315 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $1,369 | $230 | Not Implemented |
UM0315 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $526 | $225 | Implemented |
UM0315 # 07 Y:2006 | 07 | 2006 | ADD AREA LIGHTING SWITCHES | $1,294 | $1,100 | Not Implemented |
OK0737 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $30,440 | $19,260 | Not Implemented |
OK0737 # 01 Y:2006 | 01 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $22,707 | $1,420 | Not Implemented |