Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0105 # 11 Y:2012 | 11 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $1 | $1 | Not Implemented |
MZ0105 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,476 | $1,140 | Not Implemented |
MZ0105 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,288 | $2,000 | Implemented |
MZ0105 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,462 | $115,696 | Not Implemented |
MZ0105 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $920 | $1,160 | Not Implemented |
MZ0105 # 06 Y:2012 | 06 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $42,514 | $318,000 | Not Implemented |
MZ0105 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $58,099 | $39,870 | Not Implemented |
MZ0105 # 04 Y:2012 | 04 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $8,215 | $52,200 | Implemented |
MZ0105 # 03 Y:2012 | 03 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,339 | $13,500 | Not Implemented |
MZ0105 # 02 Y:2012 | 02 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $42,257 | $4,645 | Implemented |
MZ0105 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $28,300 | Implemented |
NC0461 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,960 | $300,000 | Not Implemented |
NC0461 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $163,689 | $410,000 | Not Implemented |
NC0461 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,912 | $7,160 | Implemented |
NC0461 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $24,541 | $2,400 | Implemented |
NC0461 # 05 Y:2012 | 05 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $84,150 | $40,000 | Implemented |
NC0461 # 06 Y:2012 | 06 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,695 | $0 | Implemented |
NC0461 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $41,556 | $15,000 | Not Implemented |
NC0461 # 08 Y:2012 | 08 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $458,904 | $314,375 | Implemented |
SU0321 # 08 Y:2012 | 08 | 2012 | ELIMINATE/REDUCE AN OPERATION | $2,320 | $4,530 | Implemented |
SU0321 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $5,156 | $9,920 | Not Implemented |
SU0321 # 02 Y:2012 | 02 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $206 | $669 | Implemented |
SU0321 # 03 Y:2012 | 03 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $124 | $395 | Implemented |
SU0321 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,346 | $123,757 | Implemented |
SU0321 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $955 | $4,144 | Implemented |