Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0706 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $854 | $0 | Implemented |
OR0706 # 05 Y:2018 | 05 | 2018 | REDUCE FLUID FLOW RATES | $1,821 | $3,221 | Not Implemented |
OR0706 # 04 Y:2018 | 04 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,000 | $24,775 | Implemented |
OR0706 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,311 | $2,097 | Not Implemented |
OR0706 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,952 | $28,542 | Not Implemented |
OR0706 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $12,552 | $1,970 | Implemented |
UF0520 # 03 Y:2018 | 03 | 2018 | ISOLATE HOT OR COLD EQUIPMENT | $5,366 | $5,125 | Not Implemented |
UF0520 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,699 | $15,000 | Implemented |
UF0520 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $219,545 | $970,000 | Not Implemented |
UF0520 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $2,207 | Implemented |
UF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,084 | $1,020 | Implemented |
UF0520 # 06 Y:2018 | 06 | 2018 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $75,538 | $33,400 | Implemented |
WM0121 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,083 | $4,115 | Not Implemented |
WM0121 # 08 Y:2018 | 08 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,741 | $7,920 | Implemented |
WM0121 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,876 | $3,060 | Not Implemented |
WM0121 # 17 Y:2018 | 17 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $385 | Implemented |
WM0121 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $10,644 | $10,926 | Implemented |
WM0121 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,625 | $2,330 | Implemented |
WM0121 # 11 Y:2018 | 11 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,374 | $2,400 | Not Implemented |
WM0121 # 12 Y:2018 | 12 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,095 | $1,848 | Implemented |
WM0121 # 13 Y:2018 | 13 | 2018 | USE PHOTOCELL CONTROLS | $1,065 | $1,843 | Not Implemented |
WM0121 # 14 Y:2018 | 14 | 2018 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,060 | $3,450 | Implemented |
WM0121 # 15 Y:2018 | 15 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $838 | $1,160 | Implemented |
WM0121 # 16 Y:2018 | 16 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $799 | $142 | Implemented |
WM0121 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,568 | $12,240 | Implemented |