IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
SIC 2822 Synthetic Rubber
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0971 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $137,329 $2,565,299 n/a
GT0971 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,705 $17,982 n/a
GT0971 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,632 $867 n/a
GT0971 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,384 $400 n/a
GT0971 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,025 $5,227 n/a
GT0971 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,890 $1,850 n/a
NC0643 # 02 Y:2019 02 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,495 $1,000 Implemented
NC0643 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,881 $30,000 Not Implemented
NC0643 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,445 $139,040 Implemented
NC0643 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $34,280 $75,000 Not Implemented
NC0643 # 05 Y:2019 05 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,463 $300,000 Not Implemented
LS1801 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,691 $0 Not Implemented
LS1801 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,575 $0 Implemented
LS1801 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $54,034 $0 Not Implemented
AM0701 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $57,500 $0 Implemented
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
AM0701 # 08 Y:2016 08 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $210 Implemented
AM0701 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,900 $22,740 Not Implemented
AM0701 # 06 Y:2016 06 2016 USE SYNTHETIC LUBRICANT $35,540 $0 Implemented
AM0701 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $36,800 $61,950 Not Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $515,000 $75,000 Implemented
DL0134 # 05 Y:2014 05 2014 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $54,210 $28,110 Not Implemented
DL0134 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,200 $13,590 Not Implemented