Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
121
matching recommendationsSIC | 2822 | Synthetic Rubber |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0971 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $137,329 | $2,565,299 | n/a |
GT0971 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,705 | $17,982 | n/a |
GT0971 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,632 | $867 | n/a |
GT0971 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,384 | $400 | n/a |
GT0971 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,025 | $5,227 | n/a |
GT0971 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,890 | $1,850 | n/a |
NC0643 # 02 Y:2019 | 02 | 2019 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,495 | $1,000 | Implemented |
NC0643 # 03 Y:2019 | 03 | 2019 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,881 | $30,000 | Not Implemented |
NC0643 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,445 | $139,040 | Implemented |
NC0643 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,280 | $75,000 | Not Implemented |
NC0643 # 05 Y:2019 | 05 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $77,463 | $300,000 | Not Implemented |
LS1801 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,691 | $0 | Not Implemented |
LS1801 # 01 Y:2018 | 01 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $69,575 | $0 | Implemented |
LS1801 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $54,034 | $0 | Not Implemented |
AM0701 # 04 Y:2016 | 04 | 2016 | PAY UTILITY BILLS ON TIME | $57,500 | $0 | Implemented |
AM0701 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $1,325 | $1,200 | Implemented |
AM0701 # 08 Y:2016 | 08 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,420 | $210 | Implemented |
AM0701 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,900 | $22,740 | Not Implemented |
AM0701 # 06 Y:2016 | 06 | 2016 | USE SYNTHETIC LUBRICANT | $35,540 | $0 | Implemented |
AM0701 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $36,800 | $61,950 | Not Implemented |
AM0701 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $73,125 | $105,700 | Implemented |
AM0701 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $195,000 | $2,000 | Implemented |
AM0701 # 01 Y:2016 | 01 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $515,000 | $75,000 | Implemented |
DL0134 # 05 Y:2014 | 05 | 2014 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $54,210 | $28,110 | Not Implemented |
DL0134 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,200 | $13,590 | Not Implemented |