IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
SIC 2822 Synthetic Rubber
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0134 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,090 $10,500 Not Implemented
DL0134 # 05 Y:2014 05 2014 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $54,210 $28,110 Not Implemented
DL0134 # 04 Y:2014 04 2014 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $4,630 $5,700 Not Implemented
DL0134 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,580 $0 Implemented
DL0134 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $41,430 $54,000 Implemented
DL0134 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,000 $33,600 Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $62,448 $94,000 Not Implemented
NC0438 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $5,515 $5,548 Not Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 03 Y:2011 03 2011 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $19,068 $32,000 Not Implemented
NC0438 # 04 Y:2011 04 2011 REPAIR OR REPLACE STEAM TRAPS $19,936 $5,500 Not Implemented
NC0438 # 05 Y:2011 05 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $43,023 $92,800 Not Implemented
WI0513 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,821 $640 Not Implemented
WI0513 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,987 $450 Not Implemented
WI0513 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,175 $1,000 Not Implemented
WI0513 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,291 $400 Implemented
WI0513 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,710 $5,940 Implemented
WI0513 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $0 Implemented
WI0513 # 02 Y:2006 02 2006 $16,286 $2,450 Not Implemented
WI0513 # 01 Y:2006 01 2006 $42,840 $1,800 Implemented
WI0513 # 09 Y:2006 09 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,277 $200 Implemented
AM0420 # 06 Y:2002 06 2002 REPAIR OR REPLACE STEAM TRAPS $3,300 $900 Implemented
AM0420 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,200 $0 Not Implemented