IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 2824 Organic Fibers, Noncellulosic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0243 # 02 Y:2006 02 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,291 $86,000 Not Implemented
LE0243 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $8,730 $2,400 Not Implemented
LE0243 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,824 $80 Not Implemented
LE0243 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,925 $2,000 Not Implemented
LE0243 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $995 $525 Not Implemented
LE0243 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,687 $7,500 Not Implemented
LE0243 # 01 Y:2006 01 2006 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $193,808 $200,000 Not Implemented
LE0243 # 05 Y:2006 05 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $18,286 $50,000 Not Implemented
UF0380 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,780 $2,688 Implemented
UF0380 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $1,085 $4,305 Not Implemented
UF0380 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $388,094 $48,067 Implemented
UF0380 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $961 $353 Not Implemented
UF0380 # 02 Y:2006 02 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $886 $0 Not Implemented
UF0380 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,443 $1,104 Not Implemented
UF0380 # 07 Y:2006 07 2006 ELIMINATE A BY-PRODUCT $703 $160 Implemented
GT0822 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,620 $850 Not Implemented
GT0822 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,292 $10,800 Not Implemented
GT0822 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,628 $18,865 Implemented
GT0822 # 05 Y:2006 05 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $60,069 $87,937 Not Implemented
GT0822 # 06 Y:2006 06 2006 COMBINE UTILITY METERS $4,697 $0 Not Implemented
GT0822 # 07 Y:2006 07 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $450,000 $20,000 Implemented
GT0822 # 01 Y:2006 01 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,995 $640 Implemented
NC0281 # 07 Y:2004 07 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $700 $400 Not Implemented
NC0281 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,158 $1,060 Not Implemented
NC0281 # 05 Y:2004 05 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,258 $4,000 Not Implemented