Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 2824 | Organic Fibers, Noncellulosic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0243 # 02 Y:2006 | 02 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $28,291 | $86,000 | Not Implemented |
LE0243 # 06 Y:2006 | 06 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,730 | $2,400 | Not Implemented |
LE0243 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,824 | $80 | Not Implemented |
LE0243 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,925 | $2,000 | Not Implemented |
LE0243 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $995 | $525 | Not Implemented |
LE0243 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,687 | $7,500 | Not Implemented |
LE0243 # 01 Y:2006 | 01 | 2006 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $193,808 | $200,000 | Not Implemented |
LE0243 # 05 Y:2006 | 05 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $18,286 | $50,000 | Not Implemented |
UF0380 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,780 | $2,688 | Implemented |
UF0380 # 05 Y:2006 | 05 | 2006 | ADD AREA LIGHTING SWITCHES | $1,085 | $4,305 | Not Implemented |
UF0380 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $388,094 | $48,067 | Implemented |
UF0380 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $961 | $353 | Not Implemented |
UF0380 # 02 Y:2006 | 02 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $886 | $0 | Not Implemented |
UF0380 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,443 | $1,104 | Not Implemented |
UF0380 # 07 Y:2006 | 07 | 2006 | ELIMINATE A BY-PRODUCT | $703 | $160 | Implemented |
GT0822 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,620 | $850 | Not Implemented |
GT0822 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $10,800 | Not Implemented |
GT0822 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $97,628 | $18,865 | Implemented |
GT0822 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $60,069 | $87,937 | Not Implemented |
GT0822 # 06 Y:2006 | 06 | 2006 | COMBINE UTILITY METERS | $4,697 | $0 | Not Implemented |
GT0822 # 07 Y:2006 | 07 | 2006 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $450,000 | $20,000 | Implemented |
GT0822 # 01 Y:2006 | 01 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,995 | $640 | Implemented |
NC0281 # 07 Y:2004 | 07 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $400 | Not Implemented |
NC0281 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,158 | $1,060 | Not Implemented |
NC0281 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,258 | $4,000 | Not Implemented |