IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

639

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0067 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,956 $19,000 Implemented
AS0067 # 09 Y:1992 09 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,518 $5,000 Implemented
IA0037 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,697 $2,500 Implemented
IA0037 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,046 $3,050 Implemented
SD0019 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $116 $117 Implemented
ND0024 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $781 $4,640 Implemented
ND0024 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $3,060 Implemented
ND0024 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,675 $1,400 Implemented
MA0239 # 01 Y:1992 01 1992 AIR CONDITION ONLY SPACE NECESSARY $6,633 $0 Implemented
MA0239 # 02 Y:1992 02 1992 UPGRADE OBSOLETE EQUIPMENT $5,505 $61,500 Implemented
MA0239 # 03 Y:1992 03 1992 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,762 $75 Implemented
MA0239 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,206 $1,265 Implemented
SD0014 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,040 $742 Implemented
SD0014 # 02 Y:1992 02 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $914 $1,800 Implemented
SD0014 # 05 Y:1992 05 1992 KEEP LAMPS AND REFLECTORS CLEAN $16,709 $26,424 Implemented
HO0006 # 01 Y:1991 01 1991 KEEP LAMPS AND REFLECTORS CLEAN $20,537 $17,985 Implemented
HO0006 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,403 $7,562 Implemented
HO0006 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,591 $35,640 Implemented
HO0006 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $462 $259 Implemented
HO0006 # 05 Y:1991 05 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $144,397 $0 Implemented
HO0006 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $138 $173 Implemented
HO0006 # 07 Y:1991 07 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,687 $1,400 Implemented
KU0308 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $27,543 $23,000 Implemented
KU0308 # 02 Y:1990 02 1990 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,309 $2,500 Implemented
KU0308 # 03 Y:1990 03 1990 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,009 $250 Implemented