IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0696 # 01 Y:2014 01 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,930 $22,200 Not Implemented
CO0696 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,140 $500 Implemented
CO0696 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $6,360 Not Implemented
CO0696 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $310 $480 Implemented
CO0569 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,930 $7,590 Implemented
CO0569 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $3,520 Implemented
CO0569 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $22,680 $3,500 Not Implemented
CO0569 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,470 $1,000 Implemented
CO0569 # 05 Y:2005 05 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,040 $1,980 Implemented
CO0569 # 06 Y:2005 06 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $17,660 $106,080 Not Implemented
CO0569 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $9,370 $56,000 Not Implemented
CO0569 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $560 $710 Implemented
CO0569 # 03 Y:2005 03 2005 USE SOLAR HEAT TO HEAT WATER $8,940 $108,000 Not Implemented
CO0569 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,600 $1,980 Implemented
CO0569 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,350 $5,400 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0520 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $410 $260 Not Implemented
CO0520 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $260 Implemented
CO0520 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $508 Not Implemented
CO0520 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $12,470 $10,000 Not Implemented