Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,702
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0682 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,561 | $12,599 | n/a |
SD0673 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,426 | $4,882 | n/a |
SD0673 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $652,079 | $20,176 | n/a |
SD0673 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,096 | $40,868 | n/a |
SD0673 # 10 Y:2025 | 10 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,061 | $10,319 | n/a |
SD0673 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $259 | $339 | n/a |
SD0673 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,038 | $0 | n/a |
SD0673 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $130,263 | $43,658 | n/a |
SD0673 # 12 Y:2025 | 12 | 2025 | INSTALL OCCUPANCY SENSORS | $5,238 | $2,979 | n/a |
SD0673 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,761 | $2,117 | n/a |
SD0673 # 11 Y:2025 | 11 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $33,554 | $29,800 | n/a |
SD0673 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,439 | $6,700 | n/a |
SD0673 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,554 | $1,623 | n/a |
UF0629 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,103 | $455 | n/a |
UF0629 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,306 | $25,400 | n/a |
UF0629 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,163 | $0 | n/a |
UF0629 # 05 Y:2025 | 05 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,706 | $754 | n/a |
UF0629 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,163 | $14,913 | n/a |
UF0629 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $342 | n/a |
UF0629 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,690 | $322,608 | n/a |
UF0629 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,977 | $47,000 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $19,980 | $20,761 | n/a |
UF0627 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,759 | $32,640 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |