IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0236 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $60 Not Implemented
AS0236 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,320 $12,169 Not Implemented
AS0236 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $563 $425 Not Implemented
AS0236 # 12 Y:1998 12 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,487,526 $600,000 Not Implemented
AS0236 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,972 $20 Not Implemented
AS0236 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,954 $3,800 Not Implemented
AS0236 # 11 Y:1998 11 1998 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $46,400 $2,180 Not Implemented
AS0236 # 10 Y:1998 10 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,934 $1,560 Not Implemented
AS0236 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,433 $9,200 Not Implemented
AS0236 # 08 Y:1998 08 1998 INSTALL TIMERS AND/OR THERMOSTATS $3,018 $1,725 Not Implemented
AS0236 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $120 $60 Not Implemented
AS0236 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $266 $60 Not Implemented
AS0097 # 03 Y:1993 03 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,898 $235,000 Not Implemented
AS0097 # 10 Y:1993 10 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,151 $5,265 Not Implemented
AS0097 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $180 Implemented
AS0097 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,582 $0 Not Implemented
AS0097 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $800 Implemented
AS0097 # 06 Y:1993 06 1993 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,277 $88,239 Not Implemented
AS0097 # 05 Y:1993 05 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,095 $35,400 Not Implemented
AS0097 # 04 Y:1993 04 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $61,773 $50,500 Implemented
AS0097 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,546 $2,000 Not Implemented
AS0097 # 01 Y:1993 01 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,381 $9,500 Not Implemented
AS0067 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $264 $280 Implemented
AS0067 # 05 Y:1992 05 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,625 $2,031,000 Implemented
AS0067 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $1,008 Implemented