Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0627 # 08 Y:2025 08 2025 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $41,600 $98,000 n/a
UF0627 # 03 Y:2025 03 2025 UPGRADE OBSOLETE EQUIPMENT $8,759 $32,640 n/a
UF0627 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,019 $2,949 n/a
UF0627 # 05 Y:2025 05 2025 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $3,491 $0 n/a
UF0627 # 02 Y:2025 02 2025 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,402 $72,000 n/a
UF0627 # 01 Y:2025 01 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,980 $20,761 n/a
UF0627 # 06 Y:2025 06 2025 UPGRADE CONTROLS ON COMPRESSORS $1,094 $2,000 n/a
UF0627 # 04 Y:2025 04 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,567 $9,248 n/a
MI0443 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,287 $501 Implemented
MI0443 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,482 $240 Implemented
MI0443 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,571 $14,916 Implemented
MI0443 # 06 Y:2024 06 2024 USE SOLAR HEAT TO HEAT WATER $4,071 $12,390 Not Implemented
MI0443 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,706 $1,980 Not Implemented
MI0443 # 04 Y:2024 04 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,616 $18,760 Not Implemented
MI0443 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,913 $0 Not Implemented
MI0443 # 02 Y:2024 02 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,162 $54,938 Implemented
MI0439 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $415,397 $930,319 n/a
MI0439 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,889 $70 n/a
MI0439 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $261 $275 n/a
MI0439 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,834 $0 n/a
MI0439 # 02 Y:2024 02 2024 APPLY FOR INVESTMENT INCENTIVES $187,800 $0 n/a
MI0439 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,323 $2,000 n/a
MI0436 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,045 $0 Implemented
MI0436 # 01 Y:2023 01 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $3,141,406 $1,000,000 Implemented
MI0436 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $3,663 $3,360 Implemented