Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
201
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0629 # 05 Y:2025 | 05 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,706 | $754 | n/a |
UF0629 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,103 | $455 | n/a |
UF0629 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,163 | $0 | n/a |
UF0629 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $342 | n/a |
UF0629 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,163 | $14,913 | n/a |
UF0629 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,306 | $25,400 | n/a |
UF0629 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,690 | $322,608 | n/a |
UF0629 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,977 | $47,000 | n/a |
UF0627 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,759 | $32,640 | n/a |
UF0627 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,019 | $2,949 | n/a |
UF0627 # 05 Y:2025 | 05 | 2025 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $3,491 | $0 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $19,980 | $20,761 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |
UF0627 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,094 | $2,000 | n/a |
UF0627 # 08 Y:2025 | 08 | 2025 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $41,600 | $98,000 | n/a |
MI0443 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,571 | $14,916 | Implemented |
MI0443 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,482 | $240 | Implemented |
MI0443 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $1,287 | $501 | Implemented |
MI0443 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO HEAT WATER | $4,071 | $12,390 | Not Implemented |
MI0443 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,706 | $1,980 | Not Implemented |
MI0443 # 04 Y:2024 | 04 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $7,616 | $18,760 | Not Implemented |
MI0443 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,913 | $0 | Not Implemented |
MI0443 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,162 | $54,938 | Implemented |
MI0439 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $415,397 | $930,319 | Not Implemented |