Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsSIC | 2833 | Medicinals And Botanicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0569 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,930 | $7,590 | Implemented |
CO0569 # 05 Y:2005 | 05 | 2005 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,040 | $1,980 | Implemented |
CO0569 # 06 Y:2005 | 06 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $17,660 | $106,080 | Not Implemented |
CO0569 # 07 Y:2005 | 07 | 2005 | INSTALL SKYLIGHTS | $9,370 | $56,000 | Not Implemented |
CO0569 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,770 | $3,520 | Implemented |
CO0569 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,600 | $1,980 | Implemented |
CO0569 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,350 | $5,400 | Not Implemented |
CO0569 # 11 Y:2005 | 11 | 2005 | INSTALL OCCUPANCY SENSORS | $560 | $710 | Implemented |
AS0350 # 01 Y:2003 | 01 | 2003 | INSTALL SKYLIGHTS | $2,149 | $8,264 | Not Implemented |
AS0350 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,205 | $255 | Not Implemented |
AS0350 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,575 | Not Implemented |
AS0350 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,590 | $20 | Not Implemented |
AS0350 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,725 | $2,550 | Not Implemented |
AS0350 # 06 Y:2003 | 06 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $921 | $1,300 | Not Implemented |
AS0350 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,475 | $57,000 | Not Implemented |
SD0291 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,611 | $48,000 | n/a |
SD0291 # 02 Y:2002 | 02 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $324,586 | $870,000 | n/a |
SD0291 # 03 Y:2002 | 03 | 2002 | USE PHOTOCELL CONTROLS | $14,793 | $5,000 | Not Implemented |
SD0291 # 04 Y:2002 | 04 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,460 | $1,500 | Implemented |
SD0291 # 05 Y:2002 | 05 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,452 | $0 | Implemented |
SD0291 # 06 Y:2002 | 06 | 2002 | RECYCLE NONFERROUS DUST | $2,530 | $0 | Implemented |
SD0291 # 07 Y:2002 | 07 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,452 | $6,000 | Not Implemented |
SD0291 # 08 Y:2002 | 08 | 2002 | PAY UTILITY BILLS ON TIME | $626 | $0 | Not Implemented |
OR0373 # 01 Y:2000 | 01 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,100 | $0 | Implemented |
OR0373 # 02 Y:2000 | 02 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $262 | $0 | Implemented |