Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0436 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,663 | $3,360 | Implemented |
MI0436 # 08 Y:2023 | 08 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,021 | $199 | Implemented |
MI0436 # 09 Y:2023 | 09 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,045 | $0 | Implemented |
MI0436 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,785 | $13,440 | Implemented |
MI0436 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,029 | $480 | Implemented |
MI0436 # 04 Y:2023 | 04 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,903 | $1,827 | Implemented |
MI0436 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,894 | $1,980 | Implemented |
MI0436 # 01 Y:2023 | 01 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $3,141,406 | $1,000,000 | Implemented |
MI0436 # 07 Y:2023 | 07 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,508 | $0 | Implemented |
MI0395 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $811 | Implemented |
MI0395 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,523 | $1,980 | Implemented |
MI0395 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $613 | $255 | Implemented |
MI0395 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,790 | $1,380 | Implemented |
MI0348 # 10 Y:2019 | 10 | 2019 | INSULATE BARE EQUIPMENT | $288 | $507 | Implemented |
MI0348 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,936 | $7,601 | Implemented |
MI0348 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,411 | $167,280 | Implemented |
MI0348 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,401 | $2,020 | Implemented |
MI0348 # 03 Y:2019 | 03 | 2019 | UPGRADE OBSOLETE EQUIPMENT | $12,811 | $30,000 | Implemented |
MI0348 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,851 | $3,229 | Implemented |
MI0348 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $3,201 | $750 | Implemented |
MI0256 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $23,626 | $13,599 | Implemented |
MI0256 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $23,619 | $80 | Implemented |
MI0256 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,420 | $1,660 | Implemented |
MI0256 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,196 | $3,960 | Implemented |
MI0256 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,634 | $80 | Implemented |