IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0411 # 07 Y:2005 07 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,150 $991 Not Implemented
AS0411 # 06 Y:2005 06 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,077 $8,000 Implemented
AS0411 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,783 $11,000 Not Implemented
AS0411 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $6,515 $10,000 Not Implemented
AS0411 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,306 $1,000 Implemented
AS0411 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,100 $1,500 Not Implemented
AS0411 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,988 $21,600 Not Implemented
AS0097 # 05 Y:1993 05 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,095 $35,400 Not Implemented
AS0097 # 10 Y:1993 10 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,151 $5,265 Not Implemented
AS0097 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $180 Implemented
AS0097 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,582 $0 Not Implemented
AS0097 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $800 Implemented
AS0097 # 06 Y:1993 06 1993 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,277 $88,239 Not Implemented
AS0097 # 04 Y:1993 04 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $61,773 $50,500 Implemented
AS0097 # 03 Y:1993 03 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,898 $235,000 Not Implemented
AS0097 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,546 $2,000 Not Implemented
AS0097 # 01 Y:1993 01 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,381 $9,500 Not Implemented
AS0067 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $793 $6,684 Implemented
AS0067 # 09 Y:1992 09 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,518 $5,000 Implemented
AS0067 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,956 $19,000 Implemented
AS0067 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,838 $7,000 Implemented
AS0067 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $264 $280 Implemented
AS0067 # 05 Y:1992 05 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,625 $2,031,000 Implemented
AS0067 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $1,008 Implemented
AS0067 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,425 $82,095 Implemented