Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
72
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0445 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $3,269 | $2,860 | n/a |
MI0445 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,583 | $5,793 | n/a |
MI0445 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,584 | $150 | n/a |
MI0445 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,574 | $11,027 | n/a |
MI0445 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $46,588 | $99,444 | n/a |
MI0445 # 03 Y:2024 | 03 | 2024 | PAY UTILITY BILLS ON TIME | $80,165 | $0 | n/a |
MI0445 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $217,248 | $42,472 | n/a |
MI0445 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $427,475 | $602,500 | n/a |
MI0359 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $67,825 | $25,283 | Not Implemented |
MI0359 # 10 Y:2019 | 10 | 2019 | USE SOLAR HEAT TO HEAT WATER | $33,548 | $29,934 | Not Implemented |
MI0359 # 09 Y:2019 | 09 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $47,169 | $115,295 | Not Implemented |
MI0359 # 11 Y:2019 | 11 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $32,799 | $160 | Not Implemented |
MI0359 # 13 Y:2019 | 13 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $23,546 | $480 | Implemented |
MI0359 # 08 Y:2019 | 08 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $52,238 | $52,238 | Not Implemented |
MI0359 # 12 Y:2019 | 12 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $26,313 | $7,820 | Not Implemented |
MI0359 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,837 | $1,980 | Implemented |
MI0359 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,287 | $960 | Implemented |
MI0359 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $128,514 | $60,610 | Not Implemented |
MI0359 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $182,349 | $33,814 | Implemented |
MI0359 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $281,283 | $181,281 | Implemented |
MI0359 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $547,956 | $675,600 | Implemented |
MI0339 # 02 Y:2018 | 02 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $279,023 | $250,000 | Not Implemented |
MI0339 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95,116 | $69,861 | Implemented |
MI0339 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $254,041 | $3,280 | Not Implemented |
MI0339 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,225,133 | $10,935,180 | Implemented |