Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,141
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0348 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $3,201 | $750 | Implemented |
MI0348 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,936 | $7,601 | Implemented |
MI0348 # 10 Y:2019 | 10 | 2019 | INSULATE BARE EQUIPMENT | $288 | $507 | Implemented |
CL1903 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,099 | $450 | Not Implemented |
CL1903 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,869 | $246,400 | Not Implemented |
CL1903 # 03 Y:2019 | 03 | 2019 | USE POWER DURING OFF-PEAK PERIODS | $14,816 | $1,000 | Not Implemented |
MI0339 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,225,133 | $10,935,180 | Implemented |
MI0339 # 02 Y:2018 | 02 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $279,023 | $250,000 | Not Implemented |
MI0339 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $254,041 | $3,280 | Not Implemented |
MI0339 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95,116 | $69,861 | Implemented |
MI0339 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $47,520 | $480 | Not Implemented |
MI0339 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,278 | $2,030 | Implemented |
MI0339 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,281 | $41,300 | Not Implemented |
MI0339 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $11,795 | $9,000 | Not Implemented |
LE0446 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $2,033 | $30 | Implemented |
LE0446 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $672 | $30 | Implemented |
LE0446 # 04 Y:2017 | 04 | 2017 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $9,554 | $500 | Not Implemented |
LE0446 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,447 | $1,000 | Not Implemented |
LE0446 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,087 | $5,000 | Implemented |
LE0446 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $89,899 | $25,000 | Implemented |
LE0446 # 08 Y:2017 | 08 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $1,500 | Implemented |
LE0446 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,120 | $29,145 | Implemented |
LE0446 # 10 Y:2017 | 10 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,351 | $6,525 | Implemented |
LE0446 # 01 Y:2017 | 01 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,142 | $30 | Not Implemented |
LE0443 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,762 | $1,000 | Implemented |