Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0411 # 07 Y:2005 | 07 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,150 | $991 | Not Implemented |
AS0411 # 06 Y:2005 | 06 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $4,077 | $8,000 | Implemented |
AS0411 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,783 | $11,000 | Not Implemented |
AS0411 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $6,515 | $10,000 | Not Implemented |
AS0411 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,306 | $1,000 | Implemented |
AS0411 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,100 | $1,500 | Not Implemented |
AS0411 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,988 | $21,600 | Not Implemented |
AS0097 # 05 Y:1993 | 05 | 1993 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $9,095 | $35,400 | Not Implemented |
AS0097 # 10 Y:1993 | 10 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,151 | $5,265 | Not Implemented |
AS0097 # 09 Y:1993 | 09 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $180 | Implemented |
AS0097 # 08 Y:1993 | 08 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,582 | $0 | Not Implemented |
AS0097 # 07 Y:1993 | 07 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $822 | $800 | Implemented |
AS0097 # 06 Y:1993 | 06 | 1993 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $23,277 | $88,239 | Not Implemented |
AS0097 # 04 Y:1993 | 04 | 1993 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $61,773 | $50,500 | Implemented |
AS0097 # 03 Y:1993 | 03 | 1993 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $108,898 | $235,000 | Not Implemented |
AS0097 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,546 | $2,000 | Not Implemented |
AS0097 # 01 Y:1993 | 01 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,381 | $9,500 | Not Implemented |
AS0067 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $793 | $6,684 | Implemented |
AS0067 # 09 Y:1992 | 09 | 1992 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $2,518 | $5,000 | Implemented |
AS0067 # 08 Y:1992 | 08 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,956 | $19,000 | Implemented |
AS0067 # 07 Y:1992 | 07 | 1992 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,838 | $7,000 | Implemented |
AS0067 # 06 Y:1992 | 06 | 1992 | INSULATE BARE EQUIPMENT | $264 | $280 | Implemented |
AS0067 # 05 Y:1992 | 05 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $264,625 | $2,031,000 | Implemented |
AS0067 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $352 | $1,008 | Implemented |
AS0067 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,425 | $82,095 | Implemented |