Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0779 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,725 | $57,101 | Not Implemented |
OR0779 # 03 Y:2023 | 03 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $43,575 | $54,837 | Not Implemented |
OR0779 # 02 Y:2023 | 02 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,749 | $0 | Not Implemented |
OR0779 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $3,315 | $0 | Not Implemented |
OR0670 # 06 Y:2016 | 06 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,141 | $269,109 | Not Implemented |
OR0670 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,398 | $2,405 | Not Implemented |
OR0670 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,978 | $1,314 | Implemented |
OR0670 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $14,066 | $10,367 | Implemented |
OR0670 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,371 | $5,100 | Implemented |
OR0670 # 01 Y:2016 | 01 | 2016 | REDUCE FLUID FLOW RATES | $244,946 | $880,000 | Not Implemented |
OR0669 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $4,233 | $5,720 | Not Implemented |
OR0669 # 06 Y:2016 | 06 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,137 | $340,762 | Not Implemented |
OR0669 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,352 | $500 | Not Implemented |
OR0669 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $39,019 | $15,722 | Not Implemented |
OR0669 # 02 Y:2016 | 02 | 2016 | BURN WASTE OIL FOR HEAT | $375,721 | $189,945 | Not Implemented |
OR0669 # 01 Y:2016 | 01 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,894 | $5,100 | Not Implemented |
OR0541 # 01 Y:2008 | 01 | 2008 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $277,000 | $77,500 | Implemented |
OR0541 # 07 Y:2008 | 07 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,386 | $49,854 | Not Implemented |
OR0541 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,170 | $5,250 | Not Implemented |
OR0541 # 05 Y:2008 | 05 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,926 | $289,553 | Not Implemented |
OR0541 # 04 Y:2008 | 04 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $8,200 | $8,200 | Not Implemented |
OR0541 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $10,377 | $3,000 | Not Implemented |
OR0541 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,123 | $8,200 | Not Implemented |