Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
29
matching recommendationsSIC | 2834 | Pharmaceutical Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0071 # 05 Y:2004 | 05 | 2004 | USE PHOTOCELL CONTROLS | $2,376 | $2,400 | Not Implemented |
UU0071 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $400 | Implemented |
UU0071 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,655 | $3,894 | Implemented |
UU0071 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,294 | $0 | Implemented |
UU0071 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,645 | $2,000 | Implemented |
MI0091 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,075 | $150 | Not Implemented |
MI0091 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,670 | $3,105 | Not Implemented |
MI0091 # 04 Y:2004 | 04 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,520 | $1,000 | Implemented |
MI0091 # 05 Y:2004 | 05 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $2,500 | $120 | Not Implemented |
MI0091 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,034 | $35,520 | Implemented |
UU0064 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,785 | $0 | Implemented |
UU0064 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,480 | $0 | Implemented |
UU0064 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,252 | $1,754 | Implemented |
UU0064 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,624 | $2,400 | Not Implemented |
UU0064 # 02 Y:2004 | 02 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,876 | $2,255 | Implemented |
UU0064 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,228 | $70,000 | Not Implemented |
WI0472 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,956 | $16,640 | n/a |
WI0472 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,258 | $9,780 | n/a |
WI0472 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,700 | $5,500 | n/a |
WI0472 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $596 | $640 | n/a |
WI0472 # 05 Y:2004 | 05 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,375 | $1,145 | n/a |
WI0472 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,106 | $5,500 | n/a |
WI0472 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $566 | $500 | n/a |
WI0472 # 08 Y:2004 | 08 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,032 | $700 | n/a |
NC0283 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,077 | $356 | Implemented |