IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0300 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $7,917 $1,281 Implemented
MI0300 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,521 $1,660 Implemented
MI0300 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,599 $40 Implemented
MI0300 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $37,529 $0 Implemented
MI0300 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $47,043 $12,140 Implemented
MI0300 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $68,863 $173 Implemented
MI0300 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,921 $15,156 Not Implemented
MI0300 # 02 Y:2016 02 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $96,255 $386 Implemented
MI0300 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $98,547 $35,359 Not Implemented
MI0300 # 09 Y:2016 09 2016 UPGRADE OBSOLETE EQUIPMENT $15,163 $4,691 Not Implemented
MI0300 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,807 $22,446 Implemented
MI0300 # 12 Y:2016 12 2016 USE OPTIMUM THICKNESS INSULATION $6,276 $1,644 Not Implemented
MI0300 # 13 Y:2016 13 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,924 $40 Implemented
MI0300 # 14 Y:2016 14 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,797 $2,520 Implemented
MI0300 # 15 Y:2016 15 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,584 $5,100 Not Implemented
MI0300 # 16 Y:2016 16 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $849 $29 Implemented
OR0670 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $29,141 $269,109 Not Implemented
OR0670 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $244,946 $880,000 Not Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
OR0670 # 05 Y:2016 05 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,398 $2,405 Not Implemented
OR0669 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $28,137 $340,762 Not Implemented
OR0669 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,233 $5,720 Not Implemented
OR0669 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,352 $500 Not Implemented