Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 2836 | Biological Products Exc. Diagnostic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0268 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $102,897 | $152,035 | Implemented |
MZ0268 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $25,560 | $24,500 | Implemented |
MZ0268 # 07 Y:2019 | 07 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $375,490 | $148,000 | Implemented |
MZ0268 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,263 | $720 | Implemented |
CO0696 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,140 | $500 | Implemented |
CO0696 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $310 | $480 | Implemented |
SF0442 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,021 | $0 | Implemented |
SF0442 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,864 | $2,722 | Implemented |
SF0442 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,082 | $12,459 | Implemented |
SF0442 # 05 Y:2014 | 05 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $231 | $1,559 | Implemented |
NC0470 # 01 Y:2012 | 01 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,179 | $0 | Implemented |
NC0470 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,575 | Implemented |
NC0470 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,181 | $151,669 | Implemented |
NC0470 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,336 | $1,200 | Implemented |
NC0470 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $671 | $1,100 | Implemented |
DL0062 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,900 | $30 | Implemented |
DL0062 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,000 | $5,000 | Implemented |
SU0300 # 01 Y:2010 | 01 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $64,500 | $3,122 | Implemented |
SU0300 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,801 | $1,925 | Implemented |
SD0413 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $31,920 | $13,200 | Implemented |
SD0413 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Implemented |
SD0413 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,905 | $13,511 | Implemented |
SD0413 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,623 | $13,300 | Implemented |
SD0413 # 07 Y:2009 | 07 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,800 | $2,000 | Implemented |
SD0413 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Implemented |